EcoGraf’s Epanko Graphite Project in Tanzania could lift Stage 1 output by 20% to 87,600 tonnes per year and cut operating costs by up to 6.8%, according to a Value Engineering Review. The Updated Bankable Feasibility Study, at 73,000 tonnes per annum, remains the basis for project financing.